Skip to content
Contact us
    Select language

    A low CAPEX path to higher profitability

    2 min read Hydrocracking MARPOL
    Last Reviewed On February 05, 2025
    Written By

    Jesper Gottlieb

    A low CAPEX path to higher profitability featured image

     Asset 2.png   

    Delayed coking

    MARPOL regulations are creating uncertainty about how best to invest in conversion capacity to comply or shift production to more profitable products.

    Adding a delayed coking unit to refinery operations offer a straight-forward way to comply with tougher MARPOL-mandated sulfur legislation by moving away from bunker fuel.

    Delayed coking is an attractive solution because it allows refineries to upgrade their fuel oil pool to value products such as diesel, gasoline and jet. This will position refineries to become more competitive as the industry tilts towards a higher refining margin environment.

    Better yet, delayed cokers offer a low CAPEX solution.

    Understand your challenges
    Before upgrading or revamping assets, refiners need to understand its impact on product balances and other units. What will be the impact of a delayed coker unit on product balances? What will be the ramifications for other hydroprocessing units? Will they need to be checked or revamped to process new feeds and increase capacity and utilization?

    Another challenge is determining the most profitable way to off-load the solid coke. Its value depends on its quality. Usually the lowest quality pet coke is used as fuel in plants where sulfur oxides can be trapped and converted to a high quality sulfuric acid or sulfur.

    Topsoe offers hydroprocessing catalysts and technologies for all coker fractions, enabling refineries to meet product specifications at a low cost and with higher profits. For each application, we match the optimum configuration with your feedstock and processing objectives.

    Talk to us
    To assist refiners, we offer support studies for the introduction of a delayed coker. Our experience has taught us that a solution must be customized, and should be researched to better understand your operations and marketplace.

    • Yields
    • Cost-benefit analysis
    • Catalyst implication in downstream treatment
    • Operation optimization towards unit integration
    • Retrofit of downstream existing hydroprocessing units
    • Possibilities for off-load of coke
    • What is the implication of the H2 requirement and the H2S discharge?
    • Insights to Shipping and Engine industries

    Understanding your business is the key to configuring an optimized delayed coking set-up. Contact us to learn more.

    Delayed coking_1.png

    www.topsoe.com

     

    bofu-cta-row-image bofu-cta-row-image

    CTA Row

    Bring your team, tools, and data together to launch high-impact inbound marketing campaigns in less time.

    Contact us

    Learn more about [TOPIC]

    cover-temp-720x406

    Topsoe solutions

    Brief description tincidunt neque viverra feugiat viverra mattis suspendisse montes fringilla. Dui viverra enim orci in vitae nisl.

    cover-temp-720x406

    Knowledge & insights

    Lorem ipsum dolor sit amet consectetur adipiscing elit dolor sit maecenas fringilla nunc eget ipsum dolor sit amet.

    cover-temp-720x406

    Case stories

    Lorem ipsum dolor sit amet consectetur adipiscing elit dolor sit maecenas fringilla nunc eget ipsum dolor sit amet.

    cover-temp-720x406

    About Topsoe

    Lorem ipsum dolor sit amet consectetur adipiscing elit dolor sit maecenas fringilla nunc eget ipsum dolor sit amet.

    cta-icon-1

    Stay informed

    Brief description tincidunt neque viverra feugiat viverra mattis suspendisse montes.

    cta-icon-2

    Follow Us

    Brief description tincidunt neque viverra feugiat viverra mattis suspendisse montes fringilla. Dui viverra enim orci in vitae nisl.

    bofu-cta-row-image